Brazil to Provide Up to 70% of Uruguay’s Electricity’s Needs

Brazil completed the bidding process to export up to 70% of the electricity needed by Uruguay. The announcement of the name of the winning firm, Tradener Ltda., from the state of Paraná, puts the final touches on the arrangement.

The plan was worked out on February 9 at a meeting of government representatives from Brazil, Uruguay, and Argentina, at the headquarters of the Electric Energy Commercialization Chamber (CCEE) and finalized February 23.

According to the note released by the Chamber, seven firms submitted bids, and the winning bid carries a charge of R$ 0.18 per MWh (megawatt hour) acquired on the domestic market. This price refers solely "to the administrative fee charged by the commercial supplier, to which the cost of electricity and other expenses of the system will be added."

The amount of energy to be exported will be limited to the system’s 700 MWh of interruptible transmission capacity. Transmission will begin the first week of March, on the basis of a six-month contract extendable through December. The exported energy will preferentially be generated by a thermoelectric plant that is not being used to supply the domestic market.

The contract also provides for supplying energy from hydroelectric sources, "only when there exists overflow energy potential in the reservoirs of the Brazilian system."

Moreover, "mechanisms should be established to ensure that the energy to be exported does not affect the electro-energetic security of the Brazilian electric power system."

The document also provides that "access will be guaranteed to the transmission systems, in both the basic grid and the private network, to make it feasible to export at the least possible cost."

The president of the CCEE administrative council, Antônio Carlos Fraga Machado, affirms in the note that "the bidding process is the result of a decision by the Brazilian and Uruguayan governments, following an understanding with the government of Argentina, the country which will intermediate the transmission." He goes on to inform that, through the contract, Uruguay will be able to supply up to 70% of its market.

The bidding process was overseen by representatives of the Uruguay National Administration of Electric Plants and Transmissions (UTE), the Brazilian Ministry of Mines and Energy, the Brazilian National Electric Energy Agency (ANEEL), and the CCEE. The final result still depends on a ruling by the UTE.

Agência Brasil

Tags:

You May Also Like

Chinese and Korean Mafias Lead Piracy in Brazil

The creation of a Division for the Repression of Contraband and an Anti-Piracy Division ...

Brazil: History and Emotion

Pittsburgh on the day of a Steelers Super Bowl can’t compare. Nothing in the ...

The Three Musketeers: Brazil, India and South Africa

Earlier this month, entrepreneurs from Brazil, South Africa, and India founded the Trilateral Business ...

Lula, reelected as Brazil's president talks at victory party

Lula’s Win Keeps Brazil on Its Course far from Washington

Luiz Inácio Lula da Silva’s resounding electoral victory with over 60 percent of the ...

Minas Gerais, Brazil, Gets a Second Corn Crop Record

Minas Gerais, state in southeastern Brazil, is going to pick a record crop of ...

Argentina to Impose Retaliatory Tariffs on Brazilian Products

The government of Argentina announced it would slap anti-dumping tariffs for six months on ...

RAPIDINHAS

If successful, Porto Digital might well serve as a model for revitalizing the rest ...

Tempered Optimism in Brazilian Market Rebound

Brazilian stocks rose thanks to a rebound in Brazilian issues. Yesterday, investors had reacted ...

Brazil’s Cattle Disease Spreads to 5 States and Could Cost US$ 30 Billion

Brazil created Tuesday, October 25, a special inter-ministerial task force to coordinate efforts in ...

In a Veiled Threat, Brazilian Military Denounce Lula for Corruption

Since relinquishing in 1985 the power they held for 21 years, the Brazilian Military ...

WordPress database error: [Table './brazzil3_live/wp_wfHits' is marked as crashed and last (automatic?) repair failed]
SHOW FULL COLUMNS FROM `wp_wfHits`